
"Jitai does one thing: Build the duct right, then ship it worldwide."
Three R-value tiers plus one uninsulated ventilation duct. Choose by temperature difference and run length, not by price.




Shipped from Guangzhou. Every country on the map opens — labeled ones are our main destinations; the rest can be arranged on request.
Four topics from our Cuchiilo site: why ducts need to breathe, where R4.2 fits, what R6 adds, and insulation versus energy cost.

Cold duct wall plus humid air equals water. Understand the three conditions and you will know whether to add insulation or fix the joints.

Tighter is not always better. Air-tightness and breathability must balance — if moisture cannot escape, the insulation fails first and cooling performance follows.

R4.2 is the default for most projects. But default does not mean one-size-fits-all — it has clear limits.

Going from R4.2 to R6 takes insulation from about 25 mm to 38 mm. Those extra 13 mm buy one thing: no temperature drop over long runs.
The same duct solves the same problem in four settings: no condensation, no fiber shedding, no rework.

Diameter, R-value, quantity and destination — send these four and we reply with model, packing, lead time and landed price.