This page covers commercial and process questions. For selection, installation and troubleshooting, seeTechnical Q&A.
The twelve questions buyers ask most. If yours is not here, just ask — we usually reply the same working day.
What is the minimum order quantity?
Samples from a single roll. Bulk ships FCL or LCL, and mixed diameters can share a container; confirmed against order quantity.
What is the lead time?
Quoted against actual quantity. Standard diameters schedule faster; special diameters and custom lengths need separate planning, and we confirm timing before you order.
Do you have fire certification?
Our duct is rated BS476 Part 7 · Class 1. For scanned copies of the original test reports, call 136 0288 9892.
How long is a roll, and can it be customized?
Standard 10 m (approx. 32.8 ft) compressed rolls. Length, diameter and jacket colour can be customized per market, subject to MOQ.
Why 10 m instead of 25 ft?
10 m is the common export length, about 32.8 ft. North America often works in 25 ft and we can cut to 25 ft — just say so when ordering.
How does insulation thickness map to R-value?
R4.2 is about 25 mm, R6.0 about 38 mm and R8.0 about 50 mm. Choose by temperature difference and run length: R4.2 for branches, R6 for mains and long runs, R8 for exposed rooftop work.
Will it condense?
Condensation depends on duct temperature, room dew point and insulation thickness. R4.2 is enough for standard indoor conditions; in humid regions or with low-temperature supply, go one grade up and press the joints tight.
How is it packed and loaded?
10 m compressed rolls in PE bags and cartons. A 20' container holds about 220–260 rolls and a 40' HQ about 480–560, depending on diameter.
Payment terms and currency?
Typically T/T deposit with balance against the bill of lading, negotiable per order. We quote in USD / EUR / CNY.
Which ports do you ship from?
Mainly Guangzhou and Shenzhen, or any port your forwarder nominates. FCL and LCL both available.
Can you send samples first?
Yes, from one roll. Sample and freight costs are charged as incurred and credited against bulk orders.
What is the HS code?
Declared by steel helix and foil construction, commonly 7307.99; the shipment declaration prevails and we can supply supporting customs documents.